Coarse mine feed
Crushing reduces feed before the grinding circuit.
Copper Ore Crushing & Grinding Preparation
The preparation line controls size through crushing, grinding and classification. The concentration route must be confirmed from ore mineralogy and testwork.
Suitable Materials / Application
Crushing reduces feed before the grinding circuit.
Secondary crushing can control the mill feed size.
Grinding and classification target a separately verified downstream size.
Numbered Production Line
01Vibrating Feeder
02Jaw Crusher
03Cone Crusher
04Ball Mill
05Classifier
How the Line Works
01 Ore enters through the feeder.
02 The jaw crusher performs primary crushing.
03 The secondary crusher prepares a controlled mill feed.
04 The ball mill reduces particle size.
05 The classifier separates the target size from coarse return material.
Equipment in the Line

Meters copper-bearing ore into primary crushing.




Separates the target fraction and returns coarse particles.
Real Video / Project
Discuss This Production Line
Start with the ore, capacity and test-defined target size.
Discuss This LineThis page covers particle-size preparation only. Ore mineralogy and representative testwork must determine flotation or another concentration route; recovery and concentrate grade are not guaranteed here.