Hard-rock ore
Primary and secondary crushing may be required before milling.
Gold Ore Crushing & Grinding Preparation
This line controls feed size through crushing, grinding and classification. The downstream recovery route is selected from representative testwork.
Suitable Materials / Application
Primary and secondary crushing may be required before milling.
Moisture and clay can change feeding and classification.
A preparation line can stabilize feed size for the confirmed mill duty.
Numbered Production Line
01Vibrating Feeder
02Jaw Crusher
03Fine Crusher
04Ball Mill
05Classifier
How the Line Works
01 Ore enters through a controlled feeder.
02 Primary crushing reduces the largest pieces.
03 Fine crushing prepares a consistent mill feed.
04 The ball mill reduces particle size further.
05 Classification separates the target size from coarse return material.
Equipment in the Line

Feeds ore steadily into the primary crushing stage.




Returns coarse particles and passes the classified product onward.
Technical note: For smaller gravity-focused projects, a wet pan mill may also be evaluated as a simpler grinding route. Final selection depends on ore characteristics, throughput, target fineness and downstream recovery.
Real Video / Project
Discuss This Production Line
Start with the ore, required capacity and target mill product size.