Primary crushing
Maximum feed size, hardness, abrasiveness and moisture affect the first-stage crusher discussion.
Gold Ore Project Preparation
See how crushing, fine crushing, grinding and classification prepare gold ore for a confirmed downstream process.
Start With Evidence
If a value is unknown, mark it as unknown. That is more useful than treating an estimate as measured project data.
Provide representative photos, the source of the ore and any available assay, mineralogical report or process test. Explain how the sample was taken.
State the maximum lump size, typical feed range, moisture and clay content. Confirm whether the material reaches the plant as run-of-mine ore or pre-crushed feed.
Give the required mill feed size and target product fineness. The grinding target should come from the needs of the confirmed downstream process.
State the required hourly or daily throughput, planned working hours and whether the feed is expected to be continuous.
Identify the planned downstream process, whether grinding is wet or dry, and the available water condition. Attach test information where available.
Confirm the project country, voltage, frequency, site space, access limits and installation responsibility.
Quick Process
Maximum feed size, hardness, abrasiveness and moisture affect the first-stage crusher discussion.
The mill feed target and ore behavior determine whether another crushing stage and screening need evaluation.
Feed size, target fineness, throughput and wet or dry operation are needed to discuss a ball mill.
The selected circuit must control the grinding product before it enters the verified downstream process.
Important: no recovery rate, concentrate grade or final circuit should be promised from the ore name alone. Representative testing is required.
Selection Questions
The same daily tonnage can require a different configuration when feed size, fineness, working hours or ore behavior changes.
Confirm the maximum raw feed and the size that should enter the mill. Review the jaw crusher selection factors when primary crushing is required.
State the target fineness, capacity and wet or dry process. The ball mill knowledge hub explains the information needed for model selection.
Separate laboratory findings and required targets from assumptions. If the downstream recovery route is not confirmed, say so before requesting a final configuration.
Ask for a clear boundary covering machines, motors, controls, structures, spare parts, foundations, installation and commissioning responsibilities.
Common Buyer Questions
No. Ore hardness, feed size, required mill feed, target fineness, capacity and downstream test information are needed first.
No. These stages prepare material for a downstream process. Recovery and concentrate results depend on representative ore testing and the confirmed recovery circuit.
Related Pages
For the equipment range after crushing, review grinding and related process equipment.